Back to Article

Sources for Sepulveda Is a Transit Line About Trust

Published Jul 18, 2026

Sources Used

  1. Sepulveda Transit Corridor

    LA Metro / primary

    Current planning and environmental review status, funding sources, public involvement, and project contact context.

    Accessed 2026-07-21

  2. In major step forward for Sepulveda Transit Corridor Project, Metro Board selects a route and heavy rail as Locally Preferred Alternative

    LA Metro / The Source / 2026-01-23 / primary / agency news

    Selection of heavy rail LPA, continued environmental review, design refinement, phasing, maintenance-and-storage analysis, value engineering, P3 assessment, and funding need.

    Accessed 2026-07-21

  3. Sepulveda Transit Corridor Project Draft Environmental Impact Report and Board Report

    LA Metro / 2026-01-27 / primary / environmental review

    Forecast corridor trip growth, projected ridership, travel-time claims, new transit riders, VMT reduction estimates, CEQA purpose, Measure M background, alternatives, and potential significant environmental impacts.

    Accessed 2026-07-21

Image Sources

  1. The 405 freeway in the Sepulveda Pass, photographed in March 2008.

    Cbl62 / 2008-03 / CC BY-SA 3.0

    Permission contact: https://en.wikipedia.org/wiki/User:Cbl62

    Original file: https://upload.wikimedia.org/wikipedia/commons/9/9c/The_405_in_the_Sepulveda_Pass.JPG