Sources for Los Angeles Built Empty Basins for the Mountains to Fill
Published Oct 24, 2026
Sources Used
- Flood in La Canada Valley, California, January 1, 1934
Harold C. Troxell and John Q. Peterson; U.S. Geological Survey / 1937 / Primary government technical report
The November 1933 burn area; rainfall and debris-flow sequence; more than 600,000 cubic yards of debris; more than 40 deaths; property damage exceeding $5 million; and the physical behavior of the 1934 flood.
Accessed 2026-10-29
- Alluvial Fan Flooding: The Montrose, California, Flood of 1934
W. D. Chawner / 1935-04 / Primary contemporary scholarly analysis
The concentration of damage in Montrose, La Crescenta and Glendale; the recently burned watershed; and the interpretation of the disaster as renewed alluvial-fan formation.
Accessed 2026-10-29
- Hydrologic Report, 1938–1939
Los Angeles County Flood Control District / 1939 / Primary government operations report
Pickens Debris Basin’s February 19, 1935 completion date, drainage area and reported 116,400-cubic-yard capacity; the early county debris-basin inventory.
Accessed 2026-10-29
- Assessment of Structural Flood-Control Measures on Alluvial Fans
Federal Emergency Management Agency and U.S. Army Corps of Engineers Hydrologic Engineering Center / 1993-10 / Primary government technical assessment incorporating the 1938 engineering record
The 1938 test of Los Angeles County debris basins, including basins that filled to spillway level, overflow behavior and lessons affecting later debris-basin design.
Accessed 2026-10-29
- Debris Basin Maintenance Program Initial Study/Mitigated Negative Declaration for the Section 1605 Long-term Streambed Alteration Agreement
Los Angeles County Flood Control District / 2010-11-29 / Primary government environmental and maintenance record
Pickens Debris Basin’s address; the 162-facility inventory; annual maintenance; outlet and entrainment-channel clearing; 25-percent normal and 5-percent post-wildfire sediment thresholds; sediment removal and placement practices.
Accessed 2026-10-29
- Sediment Management: What Is the Flood Control District?
Los Angeles County Flood Control District / Undated / Primary government fact sheet
The current 162-basin network; the distinction between debris basins and water-retaining dams; capture of soil, gravel, boulders and other sediment while stormwater continues downstream; periodic sediment removal.
Accessed 2026-10-29
- Floods, Federal Work, and Suburban Growth: New Deal Flood Control in North Los Angeles County
Lauren Davies / 2026-02-24 / Secondary university-affiliated public history
Federal emergency-relief funding and Army Corps oversight; construction of eight La Crescenta-area basins during 1934–1935; Pickens Basin’s reported $50,000 cost and 300-foot width; flood-control infrastructure’s relationship to suburban growth.
Accessed 2026-10-29
- Los Angeles Against the Mountains—II
John McPhee / 1988-10-03 / Secondary reported history
The path of the Pickens Canyon debris flow across Foothill Boulevard and through Montrose; the eight-foot boulder deposited below the mountain front; the labor and machinery required to maintain Los Angeles debris infrastructure.
Accessed 2026-10-29
- The Debris Basins at Pickins Yard in California
Adam DuBrowa; Federal Emergency Management Agency / 2010-03-26 / Primary image source
Cover-image identification, date, creator, post-storm condition and public-domain status.
Accessed 2026-10-29
Image Sources
- Pickens Debris Basin at Pickens Yard in La Crescenta after heavy rains deposited sediment and boulders in the basin.
Adam DuBrowa, Federal Emergency Management Agency / 2010-03-26 / Public domain in the United States; work of a federal employee produced during official duties.
Permission contact: Permission not required. Credit Adam DuBrowa/FEMA and retain the public-domain rights note.
Original file: https://upload.wikimedia.org/wikipedia/commons/1/1f/FEMA_-_43330_-_The_Debris_basins_at_Pickins_yard_in_California.jpg